In-Situ Slum Redevelopment (ISSR) & Light House Projects (LHP) under Pradhan Mantri Awas Yojana – Urban (PMAY-U)
This profile has been independently compiled from official gazette notifications and verified web domains. Source Authority Link: pmay-urban.gov.in Authority: Ministry of Housing and Urban Affairs • State/Region: Central Scheme (All India) • Last Audited: 10 Sep 2026
Quick AI Summary
Redevelops slum land in situ to provide pucca houses to slum dwellers using modern precast construction technologies, with Light House Projects showcasing rapid, eco‑friendly building methods.
Detailed Summary
Overview
The In‑Situ Slum Redevelopment (ISSR) component of PMAY‑U aims to rehabilitate slum dwellers on the same land without relocation, leveraging land as a resource to construct multi‑storey, pucca apartments. Light House Projects (LHP) are demonstration initiatives under the Global Housing Technology Challenge – India, showcasing fast‑track, precast concrete technologies that reduce construction time and environmental impact.
Implementation
State/UT governments identify slum clusters eligible for ISSR. Detailed project reports are prepared, and tenders are awarded to agencies experienced in precast construction. Beneficiaries are identified through slum surveys and issued provisional allotment letters. Construction proceeds using factory‑manufactured precast components (walls, slabs, staircases) assembled on‑site, ensuring quality control and reduced waste.
Light House Projects
LHPs serve as live laboratories for innovative construction techniques such as 3D printing, prefabricated sandwich panels, and tunnel formwork. Each LHP targets a minimum of 1,000 houses, providing valuable data for scaling up ISSR across the country.
Key Benefits & Financial Assistance
| Comparison Criteria | Benefits |
|---|---|
| Key Benefits |
|
Eligibility Criteria Profile
| Comparison Criteria | Eligibility |
|---|---|
| Minimum Age Limit | 18 Years or above |
| Physical Disability | Not Restricted (Anyone can apply) |
| Domicile State | All India (Central Scheme) |
Application Process Guide
- Participate in the local slum survey conducted by the municipal corporation or designated agency; provide proof of residence.
- If found eligible, receive a provisional allotment slip containing beneficiary details and unit number.
- Submit required documents (Aadhaar, residence proof, occupancy/census card, affidavit of no pucca house ownership) at the designated ward office during the rehabilitation drive.
- Document verification is carried out by the municipal officials; upon approval, a final allotment letter is issued.
- Upon completion of construction, take possession of the allotted unit after payment of any nominal beneficiary contribution (if applicable).
Common FAQs regarding this Yojana
Eligible permanent residents meeting the specified domicile, income, and category criteria can submit an application along with verified credentials.
Key mandatory documents include Aadhaar Card, Residence/Domicile Certificate, Income Certificate, and active Bank Account Passbook.
Benefits are directly credited to the beneficiary's Aadhaar-seeded bank account through the Public Financial Management System (PFMS) / DBT.
Applicants can track status in real-time by logging into the official portal using their Application Reference Number.