Skip to main content स्वतंत्र नागरिक उपयोगिता

Revamped Distribution Sector Scheme & Green Energy Corridor

केंद्रीय योजना (अखिल भारतीय) बुनियादी ढांचा आवेदन मोड: MIXED सक्रिय
verified
सत्यापित योजना डेटा प्रोफ़ाइल

यह प्रोफ़ाइल स्वतंत्र रूप से आधिकारिक राजपत्र अधिसूचनाओं और सत्यापित वेब डोमेन से संकलित की गई है। स्रोत प्राधिकरण लिंक: powermin.gov.in प्राधिकरण: Ministry of Power & Renewable Energy (Central) • राज्य/क्षेत्र: Central Scheme (All India) • अंतिम बार ऑडिट किया गया: 09 Sep 2026

psychology त्वरित एआई सारांश

Improves operational efficiency of DISCOMs and develops transmission infrastructure for evacuating renewable power.

विस्तृत सारांश

Overview

The Revamped Distribution Sector Scheme (RDSS) aims to reduce AT&C losses, improve metering, and enhance distribution infrastructure. The Green Energy Corridor (GEC) focuses on creating transmission networks to integrate large‑scale renewable generation into the grid.

Components

  • Smart metering (prepaid) installation for consumers.
  • Distribution transformer metering and feeder monitoring.
  • Upgradation of sub‑stations and lines under RDSS.
  • Construction of inter‑state and intra‑state transmission lines for wind and solar parks under GEC.

Implementation

Funds are routed through state power corporations (e.g., UPPCL, SBPDCL) and monitored by the Ministry of Power. Projects are sanctioned based on detailed project reports and undergo third‑party verification.

प्रमुख लाभ और वित्तीय सहायता

तुलना मानदंड लाभ
प्रमुख लाभ
  • Subsidized installation of smart prepaid meters for residential and commercial consumers.
  • Improved voltage regulation and reduction in frequency and duration of power outages.
  • Facilitated grid connectivity for rooftop solar PV systems, enabling net‑metering.
  • Enhanced transmission capacity for evacuating power from renewable energy zones.

पात्रता मानदंड प्रोफ़ाइल

तुलना मानदंड पात्रता
  • Residential and commercial electricity consumers availing supply from participating DISCOMs.
  • Distribution companies (DISCOMs) seeking financial assistance for loss reduction and infrastructure upgradation.
  • Renewable power developers requiring transmission access for wind and solar projects under the Green Energy Corridor.

आवेदन प्रक्रिया मार्गदर्शिका

  1. Identify the nodal state power corporation (e.g., UPPCL, SBPDCL) responsible for scheme implementation in your area.
  2. Submit the required application form along with documents such as consumer ID, property proof, and project details (if applicable).
  3. Await verification and approval from the corporation; upon sanction, proceed with meter installation or transmission work as per the approved plan.
  4. Utilize the online portal or designated offline centers for status tracking and subsidy disbursement.

इस योजना के बारे में अक्सर पूछे जाने वाले प्रश्न

Residential and commercial electricity consumers of participating DISCOMs, the DISCOMs themselves seeking infrastructure upgrades, and renewable power developers needing transmission access for wind or solar projects are eligible.

Applicants must provide a valid consumer ID or DISCOM registration certificate, proof of property or project location, and, for developers, a detailed project report outlining the renewable generation capacity and transmission requirements.

Yes. The scheme offers subsidized smart prepaid meter installation for consumers, grants for distribution infrastructure upgradation to DISCOMs, and financial support for transmission line construction under the Green Energy Corridor, subject to prescribed cost‑sharing norms.

Status can be tracked online via the Ministry of Power’s portal or offline through the respective state power corporation’s customer service centers using the application reference number.

The Revamped Distribution Sector Scheme and Green Energy Corridor are ongoing initiatives with no fixed closing date; applications are accepted continuously as funds are available and projects are appraised.